Aluminium Installation Instructions - Standard Box Gutter


- Place gutter in position, fixing to fascia board at 500mm centres through oversize hole to allow for expansion and contraction using 32mm stainless steel screws and oversize washer.
- Allow 2mm expansion gap between lengths and components.
- Ensure all joint areas are clean, dry, dust and grease free prior to applying silicone sealant.
- Apply 2 no. 6mm beads of low modulas silicone to each side of joint and around each bolt hole.
- Place joint clip in position. Drill gutter using 6mm HSS drill each side of joint.
- Insert 25 x 5mm stainless fixing bolts from the underside of the gutter. Do not over tighten.
- Remove any surplus sealant from faces of gutter.
- Gutter bolts may be touched up using touch up paint provided.
- Gutter may be cut using a fine tooth hacksaw or power saw with aluminium blade. Ensure any burr is removed with a file.
- Ensure any cut ends are coated using the touch up paint provided.













