Call us on 0113 279 5854 for a no pressure chat, alternatively, contact us

Cast Iron Installation Instructions - Pipes

Cast Iron Installation Instructions - Pipes

  1. Place rainwater pipe in correct position and mark wall through pre-drilled holes in ears of pipe.
  2. Drill wall using appropriate masonry bit.
  3. Fix through pre-drilled pipe ears using large head pipe nails, Rawl bolts or Coach screws.
  4. Ensure pipes are plumb and offer up next pipe or component.
  5. Fit in to sockets centralising by using 3 no. lead wedges.
  6. Joints between sections can be pointed with silicone if required.
  7. Bobbins are available to ensure a straight line to rainwater pipes where the building surface may be uneven.
  8. Pipes may be cut to length using a powered disc cutter, tungsten tipped hacksaw or pipe wheel cutter. Ensure any burr is removed with a file.
  9. Ensure all cut edges are painted.

Painting Specification

  1. Products supplied in a grey transit coat only.
  2. All pipes, gutters and accessories should be inspected for any sign of rust and cleaned using a wire brush.
  3. A primer coat should then be applied, followed by two coats of undercoat and one coat of gloss.
  4. For coastal areas, please consult your paint stockist for appropriate specification.

Focus On Copper & Zinc

Yeoman Copper & Zinc
Architects
Developers
Self Build
Restoration
Export

Technical Help Centre

Rainguards technical help centre, the place to download the guides and brochures for all of our products.

Image Gallery

Yeoman Rainguard Gallery